Introduction
In line with the Egyptian government efforts to fortify water resources and reinforce water security, Egypt has witnessed a breakthrough in the development of lifeline water projects. The main objective behind this strategy is to address the low water levels of the Nile River, being the main source of fresh water used in various applications such as drinking, agriculture, irrigation, industrial, among other potable uses.
One of the most iconic water projects among this growing portfolio is Al Galala Seawater Reverse Osmosis Desalination Plant (Al Galala SWRO) with a capacity of 150,000 m³/day.
Al Galala city is one of the most ambitious projects in Egypt with the vision to become a world-class tourism and residential destination. The entire city is built on 19,000 acres of land, on top of the highest plateau of Al Galala mountain with a breathtaking view of the Suez Gulf. The city is designed to include world-class hotels, water entertainment parks, an international marina, a commercial and residential complex and a university.
Al Galala SWRO project was developed by MetiPro, Orascom joint venture (JV), in accordance with the highest standards of quality, health and safety and with a full commitment to preserving the environment. Advanced energy saving technologies have been integrated in this project among which is reverse osmosis. Solid glass-lined steel GLS tanks, providing a wide array of tangible benefits compared to cement or steel alternatives, have also been used.
Developing Al Galala SWRO was completed in record time despite the obvious challenges that by-factor being located in such an area. The plant is built opposite a frequent flood site, creating the need to dig tunnels for seawater intake without affecting the main road, then lifting desalinated water from coastal level to storage tanks over the mountain. The type of wet soil on which the project is built was also a challenge. However, all such obstacles were overcome and the JV surpassed the set timetable and successfully commissioned the plant and produced water sixteen months after commencement of construction works. The average industry standard for a project of such size and capacity is thirty months.